Level 1 and Level 2 EV charger installation for homes and businesses across Oakland and the Bay Area. All brands, with a full panel capacity check included.
A Level 1 charger that came with your car can take over 24 hours for a full charge. A properly installed Level 2 charger cuts that down to a few hours, but only if your panel can actually support it.
Our professionally installed electricians check your existing panel capacity before recommending anything, so you get a system that's sized correctly the first time, not oversold equipment your panel can't handle.
From a single home charger to a multi-space commercial installation, we handle the full project.
240V charger installation for garages, driveways, and carports, compatible with Tesla, ChargePoint, JuiceBox, and other major brands.
Checking whether your existing panel can support a new charger, or whether a panel upgrade is needed first.
Upgrading an undersized panel to support a Level 2 charger alongside your home's existing electrical demand.
Multi-space charging installations for office buildings, retail centers, and multi-tenant properties.
Running a dedicated, code-compliant circuit from your panel to the charger location.
Weatherproof installation for outdoor charging locations as well as standard garage setups.
Full City of Oakland permit submission and inspection coordination for your charger installation.
Diagnosing and repairing an existing charger that's not working correctly or was installed incorrectly by someone else.
Where a panel upgrade is not practical, load-sharing hardware fits the charger to existing capacity.
Not every electrician who installs a charger checks whether your panel can actually handle it. We do.
We check your existing capacity before recommending equipment, so you're not oversold a charger your system can't support.
Tesla, ChargePoint, JuiceBox, Emporia, and other major charger brands, residential and commercial.
California professionally installed, so the wiring and panel work behind your charger is done safely and to code.
A written, itemized quote before work starts, including any panel upgrade if one is needed.
We install EV chargers throughout Oakland, San Francisco, Berkeley, Alameda, San Leandro, Richmond, El Cerrito, Emeryville, Albany, Piedmont, Orinda, Lafayette, Castro Valley, San Rafael, and nearby communities. Not sure if we cover your location? Give us a call.
Downtown Oakland
Jack London Square
Rockridge
Temescal
Fruitvale
Montclair
Piedmont Avenue
Uptown Oakland
Chinatown
West Oakland
Lake Merritt
Adams Point
Grand Lake
Dimond District
East Oakland
North Oakland
A clear process from first call to a working charger.
We check your panel capacity, charger location, and any electrical work needed to support the installation.
You get an itemized quote covering the charger circuit, any panel upgrade, and installation labor.
We run the dedicated circuit, mount the charger, and connect it, following manufacturer specs and local code.
We test the charger with your vehicle and walk you through any app or scheduling features before we leave.